  • The project of the 5th extension of the Court comprises two interlocking sets that constitute the tower and the base. The tower is made up of two staggered volumes: a first golden volume takes up the height and the image of the two towers already built, while a second black volume, 115 m high and 15 m higher than the current towers, shows facades that echo the “Ring” building encircling the Palais de Justice. The elevation of this black volume creates a landmark for the entire site.

​

Duration

  • In progress.

​

Tasks

  • As part of the lifting of the reservations for the facade lot and due to the disappearance of the facade designer who carried out the project (Félix Giorgetti sa), LFE is providing the general contractor Felix Giorgetti with a management team for the lifting of the reservations for the lot in question and the supervision of additional work related to the facades lot (replacement of glazing, verification of the conformity of the elements of the double skin, research and sealing of infiltrations at the level of the facades and the glass roof, etc.) The missions that we carry out for our client are: the management of technicians, the development of intervention methods on a sensitive site in activity, the management of purchases related to the aforementioned works, the management of logistics for interventions requiring the presence of a nacelle, crane or other element for lifting equipment or people, ….

       

db273dea-e965-49ed-80fc-2809e4d90e4a.jpg
69ae1314-b00a-45a0-903f-d693db603960.jpg
7daa05f5-afb3-459d-93db-53c2ae580673.jpg
65a69aa6-64c5-4dd0-8bbf-9ba981bd6b1d.jpg
bottom of page